Mon projet 2 6

NJC.© -Braila Bridge, load tests completed on the new bridge

June 23, 2023 - Load tests completed on Braila Bridge, second longest suspension bridge on Continental Europe.

Load tests – both static and dynamic – to confirm the structure’s stability have been completed ahead of its inauguration. The first series of tests involved up to 60 trucks for a combined weight of 2,400 tonnes (equal to about 400 elephants) to check the structure’s soundness.

Bridge to ease crossing over Danube River for 7,000 vehicles a day, replacing ferries

Find out more: https://www.webuildgroup.com/en/media/press-releases/webuild-load-tests-completed-on-braila-bridge-across-danube-romania "

  • 2 votes. Moyenne 5 sur 5.